star signaling team

Our signaling team are basically responsible for the safety and smooth running of the LRT.Our Starline LRT running twin tracks located within and outskirt of Kuala Lumpur. Everage of 20 trains running everyday on these tracks with a gap of about 3 min.To ensure a consistant frequency of train and puntuallity of train services to the public, the signaling system installed will monitor full time electronicaly the movement of train along 28km of track.

Saturday, August 20, 2011






Posted by Azlan's at 8:55 AM No comments:

Satu malam dibulan Ramadan

Posted by Azlan's at 7:48 AM No comments:

Sunday, July 25, 2010




Posted by Azlan's at 9:12 AM No comments:

Signaling Team 2010





Posted by Azlan's at 8:42 AM 1 comment:

Thursday, September 03, 2009

New cable joint technology





Posted by Azlan's at 2:41 PM No comments:

Most difficult access track circuit filter


Posted by Azlan's at 2:34 PM No comments:

Thursday, July 20, 2006

Day rectification of failures and night for preventive maintenance










Posted by Azlan's at 9:12 AM 1 comment:
The Computer that runs the show needs maintenance too...



Posted by Azlan's at 9:02 AM No comments:

Star LRT Signaling System Calibration


Track Circuit Calibration
Posted by Azlan's at 8:00 AM No comments:

Friday, July 14, 2006

Star LRT Signaling Team

Posted by Azlan's at 11:26 AM No comments:
Home
Subscribe to: Comments (Atom)

Followers

About Me

My photo
Azlan's
View my complete profile

Blog Archive

  • ▼  2011 (2)
    • ▼  August (2)
      • Satu malam dibulan Ramadan
  • ►  2010 (2)
    • ►  July (2)
  • ►  2009 (2)
    • ►  September (2)
  • ►  2006 (4)
    • ►  July (4)
Awesome Inc. theme. Powered by Blogger.