Our signaling team are basically responsible for the safety and smooth running of the LRT.Our Starline LRT running twin tracks located within and outskirt of Kuala Lumpur.
Everage of 20 trains running everyday on these tracks with a gap of about 3 min.To ensure a consistant frequency of train and puntuallity of train services to the public, the signaling system installed will monitor full time electronicaly the movement of train along 28km of track.
Thursday, July 20, 2006
Day rectification of failures and night for preventive maintenance
1 comment:
salam tuan azlan,
mintak izin tuan jadi tamu blog tuan..dan salam perkenalan buat tuan
Post a Comment